The course design

The course’s standard is financially informed managers, not financial analysts, and it makes no claim to prepare anyone for a chief financial officer’s job. I start every course from what people should be able to do in their own work when it ends, and here the answer shows in what learners hand in: a resource allocation brief, a financial health assessment in six to eight slides, a written recommendation of 500 to 700 words, and a board investment recommendation in slides.

The course is set inside one fictional enterprise, and each learner works individually as a member of its executive team. Four two-week arcs share one rhythm: a technical week, then an applied week that ends in one of the deliverables.

MBA 630 · Four arcs, eight weeks
  1. Arc 1
    Week 1Technical learningThen a knowledge check.
    Week 2ApplicationThen a formal deliverable.
  2. Arc 2
    Week 3Technical learningThen a knowledge check.
    Week 4ApplicationThen a formal deliverable.
  3. Arc 3
    Week 5Technical learningThen a knowledge check.
    Week 6ApplicationThen a formal deliverable.
  4. Arc 4
    Week 7Technical learningThen a knowledge check.
    Week 8ApplicationThen a formal deliverable.
Drawn for this page. Each arc is one scenario inside the same fictional enterprise.
Course Flow at a Glance · design studyOpen in new window
Course Flow at a Glance, MBA 630: a design study for the course’s entry page, showing four two-week engagements and what each one asks for.

In the first design conversations I proposed two things, and they fared differently. One was a toolkit of small steps (a skill, some practice, a low-stakes check) in place of a single large assessment at the end, and the finished course has that grain. The other was a scripted branching simulation of a resource-allocation meeting, meant to assess a participation outcome; I made early prototypes, then set them aside and archived them.

Finance Lab: From Profit to CashOpen in new window
Finance Lab, MBA 630: an optional worked example that traces profit to cash before students meet the case evidence.

A later correction mattered more than either proposal. By late July the scenario architecture I had been building was too detailed for the weeks available, and for learners whose role is managerial decision-making, not financial analysis, so the subject matter expert, the program director, and I agreed to simplify it. The decision log records the simplification: the enterprise supplies the story and the roles, and each unit’s finances stand alone; learners read supplied financial evidence, complete or verify only bounded calculations, interpret the result, and recommend, while full models and keys stay on the faculty side. The tracker of scenario components went from 61 rows to 32.

Scenario opening
  1. Scenario openingA record season, a cash shortfall, and two executives who are both right.Open in new window
  2. Financial orientationWhere to look in the evidence, and what to ask of it.Open in new window
  3. Week 4 deliverableThe Financial Health Assessment brief.Open in new window
Three pages from one scenario, MBA 630 Financial Management, in the order learners meet them. The people named are characters in the fictional enterprise, and the dollar figures are invented.

The build as infrastructure

A design that changes under review needs somewhere to keep its state. Here that was a repository of its own, started in June from my starter course-build workbench. I designed the layout and the rules, and AI coding agents (Codex and Claude Code) wrote most of the scripts. The layout lets an agent and a person both tell, from where a file sits, whether it is supplied evidence, design in progress, a draft waiting on a reviewer, or generated output.

One repository, six lanes
  1. reference
    Source evidenceThe blueprint, readings and resources as supplied, with an inventory and file hashes.
  2. design
    The canonical sourcesMarkdown for the scenario, weekly blueprints and assessments, and the scenario manifest: the single authority on the status of every piece.
  3. review
    What reviewers seeReview candidates, diagnostics, and the record of what went out for review and what came back.
  4. generated
    What the scripts buildHTML pages on one stylesheet, quiz and practice packages, title cards.
  5. exports
    Brightspace evidenceCourse exports kept byte for byte, as evidence.
  6. archive
    Superseded materialDated and recoverable, and not current instruction.
Beside the lanes sit the plans, a decision log, the scripts with their tests, and the agent contract with its skills.

Within that layout a few files carry authority, and the chief of them is the scenario manifest. It lists every source with its status, every piece of every arc with its state, and 16 numbered decision gates, each with a question, an owner, and a resolution. Each piece is also labeled by where its substance comes from, so an invented detail cannot pass for something the subject matter expert supplied.

The scenario manifest, chief among the files that carry authority
The scenario manifestA JSON file
  1. Sources
    Every source, with its status
  2. Pieces
    Every piece of every arcWith a state that runs from not started to validated, and a label for where its substance comes from.Derived from a sourceSeeded by oneInferred as a build needGenerated as a draft
  3. Decision gates
    Sixteen numbered gatesEach with a question, an owner, and a resolution.
The status pageGenerated from the manifest and never edited by hand; a small command checks that it is current.

Everything learners see has a Markdown source from which the HTML is generated; all 47 topic pages share one stylesheet and were built to WCAG AA contrast targets (a browser accessibility recheck is on record for one unit). Each arc has a validator, and the result I came to value is PASS_WITH_HELD_GATES: the checks pass, and the report still names what is waiting on a person. Local validation cannot stand in for academic approval, final settings, accessibility and permission checks, or an import and re-export test. About 75 dated plans and a decision log record the work, and the agent contract asks that every result be “reviewable by a human without guessing what happened.”

The conversation and the documents that carried it

None of the people whose judgment the course depends on works in a repository, so the design conversation had to be carried in documents they already use and brought back without losing who said what. It began in the college’s course vision worksheet, a Word document three of us wrote in: the subject matter expert on the course goals, the program director on the learning outcomes, and I in comments and closing notes. A script converts such a document to Markdown and keeps every tracked insertion and comment, with author and date, beside the text it is anchored to.

From there, any question that only the subject matter expert or the director could settle became a gate in the manifest, owned by that role. One entry in the decision log concerns a comment in the working blueprint that asked for two arcs to be swapped while the body kept the original order; the program director clarified the sequence, and the log cites that clarification, not my reading of the document.

Review went out as Google Docs. For the subject matter expert I prepared a short “start here” document and an email that put the four deliverables first and asked for general approval or a short list of revisions. Bringing review back was harder, because the director was still editing. What came back was sorted: accepted text counted as source, suggestions counted as proposals, direct corrections went into the Markdown before anything was regenerated, and decisions went onto a one-page list of items that “should not be resolved by inference.” The last full pass finished a week before the course opened.

A loop in five steps
  1. 01Canonical Markdown source
  2. 02Review copy in Google Docs
  3. 03What comes backSorted intoAccepted textSuggestionsDirect correctionsDecisions for a named owner
  4. 04The reconciled source and decision log
  5. 05Regenerated pages
BrightspaceLate edits that never passed through the loop.

The arrangement worked, but it cost a great deal. My closeout note says that keeping review copies for people outside the repository and porting their changes back “created substantial back-and-forth work and competing authorities.”

Video and faculty materials

The same habits carried into media. The weekly videos are cut from one expert interview, and Codex made the cuts in Adobe Premiere Pro, in a copy of the project and under the six checks in the figure. A playback pass by a person, for cadence, remained the last gate before export.

One interview, nine sequences
  1. 01 · The bridgeA third-party bridgeIts source was first cloned at a fixed commit, built, and tested.
  2. 02 · The cutA working copyThe cuts were made in a working copy, so the original project stayed unchanged.
  3. 03 · StructureA scriptIt validated the structure of every sequence.
  4. 04 · AuditAn audit against the transcriptIt restored two omitted passages and adjusted two cuts so that no excerpt lost its context.
  5. 05 · PlaybackA playback pass by a personFor cadence, the last gate before export.
  6. 06 · ExportEvery exported fileChecked for name, duration, resolution, and audio.
The bridge is an unsigned panel that needs a debug mode; the plan says to remove it afterwards.

The people teaching the course get a faculty course guide, a quick guide, and a one-page view of the course flow, and the guide is where I misjudged a reader. The plan records that the first complete draft was “too abstract and over-designed for its purpose,” and the revision rebuilt it as “a plain, peer-to-peer course map.” It addresses an experienced finance instructor who is new to this course, so it explains the course and leaves finance alone, and it was checked against the latest export of the course, by then a better witness than my design sources.

What the closeout taught

The final export was copied into the repository’s exports folder unchanged and compared file by file with the one before it: 95 files in each, 79 identical and 16 changed, two of the 47 pages among them. The comparison showed that the finished course held edits made directly in Brightspace that none of my sources contained: a new quotation on two pages, a link to the faculty guide, a few assignment settings. They were legitimate edits, but the repository no longer described the product.

I then had the repository audited for what should move into my shared tooling, and a second audit, from a different model, was told not to treat the first one’s findings as conclusions it had to affirm. Two fixes went into the shared tooling, one of them small and telling: the converter for reviewers’ Word documents had been dropping comments anchored inside table cells.

The audit is blunt about the rest: of 7,202 tracked files, 248 were design and source work, and 88 scripts had 36 tests between them. It observes that “Development wrapped” and “all current artifacts validate” are not equivalent here, and that even the manifest, the one authority on status, had fallen behind the work. My closeout note calls the repository “a useful failure case for stricter course-development repository controls.”

I took four things from it: one declared authority, enforced lanes, a reconciliation step when the final export comes in, and a way for an outside reviewer to comment without creating a second editable copy. The next build, a marketing course begun the same week, tried one answer to the last of these: the subject matter expert’s document stayed theirs, every wording change the build made was recorded with its authorizer and reason, and what went back was a generated document listing the changes and the questions still open. Whether that holds for a course with as much invented scenario material as this one, I do not yet know.

What this page leaves out

The course belongs to the university, so this page describes it and shows only the five pages above. In all five, the page design and structure are mine; the wording was developed with the subject matter expert and the program director. The pages’ private links and the Finance Lab’s practice checks are left out, and no knowledge-check questions are shown. The fictional enterprise is named only in the design study.